This handbook contains guidance on setting up and operating mechanical systems commonly encountered during bare base operations. It addresses, as appropriate, site selection and layout, major components, setup, operation, and shutdown of the M-80 Water Heater; Advanced Design Refrigerator, 300 Cubic Foot (ADR-300); Field Deployable Environmental Control Unit (FDECU); and the 130K Portable Heater. It is meant to be used by civil engineer heating, ventilation, air conditioning, and refrigeration (HVAC/R) personnel in performing their beddown and sustainment mission taskings under contingency conditions.
INTRODUCTION * 1.1. General Information * 1.2. Overview * 1.3. Safety * 1.4. Additional Information * Chapter 2 * M-80 WATER HEATER * 2.1. General Information * 2.2. Characteristics and Features * 2.3. Set-Up Procedures * 2.4. Operation * 2.5. Shutdown Procedures * 2.6. Preparation for Storage or Shipment * Chapter 3 * ADVANCED DESIGN REFRIGERATOR, 300 CUBIC FOOT (ADR-300) * 3.1. General Information * 3.2. Characteristics and Features * 3.3. Set-Up Procedures * 3.4. Operation * 3.5. Shutdown Procedures * 3.6. Preparation for Storage or Shipment * Chapter 4 * FIELD DEPLOYABLE ENVIRONMENTAL CONTROL UNIT (FDECU) * 4.1. General Information * 4.2. Characteristics and Features * 4.3. Set-Up Procedures * 4.4. Operation * 4.5. Shutdown Procedures * 4.6. Preparation for Storage or Shipment * Chapter 5 * 130K MULTI-FUELED, PORTABLE HEATER * 5.1. General Information * 5.2. Characteristics and Features * 5.3. Set-Up Procedures * 5.4. Operation * 5.5. Shutdown Procedures * 5.6. Preparation for Storage or Shipment * Chapter 6 * INFORMATION COLLECTION, RECORDS, AND FORMS * 6.1. Information Collections * 6.2. Records * 6.3. Forms (Adopted and Prescribed)
This handbook contains guidance on setting up and operating mechanical systems commonly encountered during bare base operations. It addresses, as appropriate, site selection and layout, major components, setup, operation, and shutdown of the M-80 Water Heater; Advanced Design Refrigerator, 300 Cubic Foot (ADR-300); Field Deployable Environmental Control Unit (FDECU); and the 130K Portable Heater. It is meant to be used by civil engineer heating, ventilation, air conditioning, and refrigeration (HVAC/R) personnel in performing their beddown and sustainment mission taskings under contingency conditions.
INTRODUCTION * 1.1. General Information * 1.2. Overview * 1.3. Safety * 1.4. Additional Information * Chapter 2 * M-80 WATER HEATER * 2.1. General Information * 2.2. Characteristics and Features * 2.3. Set-Up Procedures * 2.4. Operation * 2.5. Shutdown Procedures * 2.6. Preparation for Storage or Shipment * Chapter 3 * ADVANCED DESIGN REFRIGERATOR, 300 CUBIC FOOT (ADR-300) * 3.1. General Information * 3.2. Characteristics and Features * 3.3. Set-Up Procedures * 3.4. Operation * 3.5. Shutdown Procedures * 3.6. Preparation for Storage or Shipment * Chapter 4 * FIELD DEPLOYABLE ENVIRONMENTAL CONTROL UNIT (FDECU) * 4.1. General Information * 4.2. Characteristics and Features * 4.3. Set-Up Procedures * 4.4. Operation * 4.5. Shutdown Procedures * 4.6. Preparation for Storage or Shipment * Chapter 5 * 130K MULTI-FUELED, PORTABLE HEATER * 5.1. General Information * 5.2. Characteristics and Features * 5.3. Set-Up Procedures * 5.4. Operation * 5.5. Shutdown Procedures * 5.6. Preparation for Storage or Shipment * Chapter 6 * INFORMATION COLLECTION, RECORDS, AND FORMS * 6.1. Information Collections * 6.2. Records * 6.3. Forms (Adopted and Prescribed)