Central Utah Project (CUP): Bonneville Unit - Historic Reclamation Projects Book - Water Projects, Flood Control, Starvation Dam, Reservoirs, Aqueducts, Tunnels, Canals, Power Plants

Nonfiction, Science & Nature, Technology, Engineering, Civil
Cover of the book Central Utah Project (CUP): Bonneville Unit - Historic Reclamation Projects Book - Water Projects, Flood Control, Starvation Dam, Reservoirs, Aqueducts, Tunnels, Canals, Power Plants by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781310197529
Publisher: Progressive Management Publication: September 26, 2014
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781310197529
Publisher: Progressive Management
Publication: September 26, 2014
Imprint: Smashwords Edition
Language: English

The Central Utah Project (CUP) is a massive and complicated water development project. It is the largest in the State of Utah. The ultimate plans for the CUP were among the largest and most complex contemplated by the Bureau of Reclamation. To make the project more manageable, Reclamation broke the initial phase of the CUP into four independent projects which could be united by the ultimate phase. Of the four units authorized by Congress as the initial phase, the largest and most complex is the Bonneville Unit, which itself is broken into interconnected parts. Reclamation's plans called for ten new reservoirs; enlargement of two existing reservoirs; 140 miles of aqueducts, tunnels, and canals; three power plants; nine pumping stations; and 200 miles of pipe drains. Because of its size and complexity, it is the Bonneville Unit that people most frequently associate with the CUP, sometimes to the exclusion of the Vernal and Jensen Units, which have been constructed to benefit communities in the Uinta Basin.

The history of the CUP is as large and complex as the project itself. And as with the project, the popular notion is that the history of the Bonneville Unit is the history of the CUP. There is some validity in this assumption. Certainly the history of the other units of the CUP, particularly those that were not built, includes colorful stories of the struggles to push forward a vision—engineering challenges, political intrigue, battles with opponents, courtroom drama, and the like. But the history of the CUP is filled with all of these. The history of the CUP is a microcosm of the large history of the battles over the Colorado River, wrapped with a thick layer of its own unique history.

Project Location * Historical Setting * Project Authorization * Construction History * Starvation Complex * Starvation Dam * Knight Diversion Dam * Starvation Feeder Conduit * Bottle Hollow * Strawberry Aqueduct and Collection System * Water Hollow Tunnel - Channel Number 2 * Soldier Creek Dam * Layout and Currant Tunnels * Jordan Aqueduct Reach I and II * Currant Creek Dam * Vat Tunnel * Stillwater Tunnel * "Hit List" * West Fork Pipeline- Vat Diversion Dam and 404 permits * Hades and Rhodes Tunnels * Supplemental Repayment Contract Jordan Aqueduct-Reach III and IV-TPA Lawsuit * Upper Stillwater Dam * North Fork Siphon * Doc's, Hades, Win, and Rhodes Diversions and Feeder Pipelines * Jordanelle Dam * Diamond Fork Power System - Syar Tunnel and Sixth Water Flow Control Structure * CUP Completion Act * Post Construction History * Bonneville Irrigation and Drainage System - Utah Lake System * Diamond Fork System * Settlement of Project Lands * Uses of Project Water * Conclusion

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

The Central Utah Project (CUP) is a massive and complicated water development project. It is the largest in the State of Utah. The ultimate plans for the CUP were among the largest and most complex contemplated by the Bureau of Reclamation. To make the project more manageable, Reclamation broke the initial phase of the CUP into four independent projects which could be united by the ultimate phase. Of the four units authorized by Congress as the initial phase, the largest and most complex is the Bonneville Unit, which itself is broken into interconnected parts. Reclamation's plans called for ten new reservoirs; enlargement of two existing reservoirs; 140 miles of aqueducts, tunnels, and canals; three power plants; nine pumping stations; and 200 miles of pipe drains. Because of its size and complexity, it is the Bonneville Unit that people most frequently associate with the CUP, sometimes to the exclusion of the Vernal and Jensen Units, which have been constructed to benefit communities in the Uinta Basin.

The history of the CUP is as large and complex as the project itself. And as with the project, the popular notion is that the history of the Bonneville Unit is the history of the CUP. There is some validity in this assumption. Certainly the history of the other units of the CUP, particularly those that were not built, includes colorful stories of the struggles to push forward a vision—engineering challenges, political intrigue, battles with opponents, courtroom drama, and the like. But the history of the CUP is filled with all of these. The history of the CUP is a microcosm of the large history of the battles over the Colorado River, wrapped with a thick layer of its own unique history.

Project Location * Historical Setting * Project Authorization * Construction History * Starvation Complex * Starvation Dam * Knight Diversion Dam * Starvation Feeder Conduit * Bottle Hollow * Strawberry Aqueduct and Collection System * Water Hollow Tunnel - Channel Number 2 * Soldier Creek Dam * Layout and Currant Tunnels * Jordan Aqueduct Reach I and II * Currant Creek Dam * Vat Tunnel * Stillwater Tunnel * "Hit List" * West Fork Pipeline- Vat Diversion Dam and 404 permits * Hades and Rhodes Tunnels * Supplemental Repayment Contract Jordan Aqueduct-Reach III and IV-TPA Lawsuit * Upper Stillwater Dam * North Fork Siphon * Doc's, Hades, Win, and Rhodes Diversions and Feeder Pipelines * Jordanelle Dam * Diamond Fork Power System - Syar Tunnel and Sixth Water Flow Control Structure * CUP Completion Act * Post Construction History * Bonneville Irrigation and Drainage System - Utah Lake System * Diamond Fork System * Settlement of Project Lands * Uses of Project Water * Conclusion

More books from Progressive Management

Cover of the book 2015 Social and Behavioral Sciences Team Annual Report: The Obama Administration's Experiments on Nudging Citizen Behavior - Projects Ranging from Insurance Enrollment to Debt Repayment by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: North Korea Country Handbook - DPRK Political and Economic Overview, Transportation, Geography, Climate and Weather, Military Forces and Doctrine by Progressive Management
Cover of the book 21st Century U.S. Military Documents: Air Force C-130J Super Hercules Transport Aircraft - Operations Procedures, Aircrew Evaluation Criteria, Aircrew Training Flying Operations by Progressive Management
Cover of the book Risk Mitigation and Leadership in Tactical U.S. Army Infantry Training: Combat Readiness Affected by Commander's Authority to Execute Risk Mitigation, Case Studies in Korean and Vietnam Wars by Progressive Management
Cover of the book Social Media: The Fastest Growing Vulnerability to the Air Force Mission - Cyberspace Issues, Facebook, LinkedIn, Twitter, Cybersecurity, Bring Your Own Device (BYOD), Safeguarding Personal Data by Progressive Management
Cover of the book Flawed Decisions: The Korean War September - November 1950 - Successful Amphibious Assault at Inchon Followed by Inappropriate Course of Action, Hasty Plan, X Corps to Wonsan, Red China Intervenes by Progressive Management
Cover of the book 21st Century U.S. Military Documents: Air Force Aviation Management Instruction - Guidance for Administering Aircrew Flight Management Programs for Flying Unit Commanders and Aircrew Personnel by Progressive Management
Cover of the book U.S. Marines in Vietnam: The Advisory and Combat Assistance Era 1954-1964 - War in Southeast Asia, Communist Insurgency, MACV, SHUFLY, Soc Trang, Mekong Delta, VNMC, Monsoons, Prelude to Escalation by Progressive Management
Cover of the book History of the Joint Chiefs of Staff: The Prelude to the War in Vietnam 1954-1959 - North and South Vietnam, Geneva Conference, Collins Mission by Progressive Management
Cover of the book Interagency Standards for Fire and Fire Aviation Operations: Federal Wildland Fire Management Policy, Safety, Risk Management, Chemicals and Delivery Systems, Firefighting Training and Equipment by Progressive Management
Cover of the book The Air Force Integrates: 1945-1964 - World War II, Freeman Field Mutiny, MacDill Riot, Unbunching, Eisenhower, Little Rock, Kennedy Era and the Civil Rights Act, Travis Riot, Blacks in USAF by Progressive Management
Cover of the book Cryptocurrency and State Sovereignty: Comprehensive Review of Bitcoin, Blockchain, and Virtual Currency Technology, Hash Functions, Merkle Trees, and Security, Government Bans and Regulations by Progressive Management
Cover of the book 21st Century VA Independent Study Course: American Prisoners of War (POW) - Diseases, Service-Connected Disabilities, Psychiatric Problems, Internment Morbidity and Mortality, Camp Life by Progressive Management
Cover of the book Operationalizing the Impossible: The Responsibility to Protect (R2P) Movement - Ending Genocide Through Prevention and Military Intervention, Cast Study of Rwanda, Bosnia, Humanitarian Intervention by Progressive Management
Cover of the book 21st Century Military Documents: A Guide to Female Soldier Readiness - Hygiene, Nutrition, Health, Reproductive Hazards, Pregnancy, Parenting, STDs, Menstruation, Sexual Assault, Injury, Family Care by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy