James Webb Space Telescope Independent Review Board Report May 2018: New 2021 Launch Date and Substantially Higher Costs for Next Great Astronomy Observatory, Findings of Human Errors

Nonfiction, Science & Nature, Technology, Aeronautics & Astronautics, Science, Physics, Astronomy
Cover of the book James Webb Space Telescope Independent Review Board Report May 2018: New 2021 Launch Date and Substantially Higher Costs for Next Great Astronomy Observatory, Findings of Human Errors by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9780463673942
Publisher: Progressive Management Publication: June 27, 2018
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9780463673942
Publisher: Progressive Management
Publication: June 27, 2018
Imprint: Smashwords Edition
Language: English

This report, released by NASA in late June 2018, provides the results of a vital independent review board report on the status of the troubled James Webb Space Telescope (JWST) project. The results were quite dramatic: the launch date for the telescope has been delayed to March 2021, and the cost of the project is now estimated to have risen nearly $1 billion. The report notes that delays and overruns can be attributed to a number of factors, including human mistakes during integration and testing, and embedded problems.

Summary and Conclusion - JWST is an observatory with incredible capability, awesome scientific potential and significant complexity, risk and first-time events. OTIS Integration and Test (l&T) is complete and has demonstrated the exceptional science capability of the system. Significant launch date delays and resulting cost caused by human errors, embedded problems, excessive optimism in l&T planning, lack of sunshield experience and system complexity have occurred. Small l&T problems can have a major impact upon schedule and cost. JWST inherent risk requires mission success be the highest priority in completing JWST development.

The Webb IRB believes that implementing all recommendations contained in this report will contribute to maximizing the probability of mission success. Eliminating the schedule and cost impact of human errors and embedded problems is critical to completing the successful development of JWST. The Webb IRB believes that JWST should continue based on its extraordinary scientific potential and critical role in maintaining U.S. leadership in astronomy and astrophysics. This report contains numerous recommendations all directed toward contributing to the maximization of JWST mission success. The Webb IRB strongly recommends that all the recommendations be implemented.

Webb's world-class science, from detecting light from the first stars and galaxies in the distant universe to probing the atmospheres in nearby exoplanets for possible signs of habitability will underpin many other astrophysics projects that will use its high-caliber capabilities to enhance their science return.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

This report, released by NASA in late June 2018, provides the results of a vital independent review board report on the status of the troubled James Webb Space Telescope (JWST) project. The results were quite dramatic: the launch date for the telescope has been delayed to March 2021, and the cost of the project is now estimated to have risen nearly $1 billion. The report notes that delays and overruns can be attributed to a number of factors, including human mistakes during integration and testing, and embedded problems.

Summary and Conclusion - JWST is an observatory with incredible capability, awesome scientific potential and significant complexity, risk and first-time events. OTIS Integration and Test (l&T) is complete and has demonstrated the exceptional science capability of the system. Significant launch date delays and resulting cost caused by human errors, embedded problems, excessive optimism in l&T planning, lack of sunshield experience and system complexity have occurred. Small l&T problems can have a major impact upon schedule and cost. JWST inherent risk requires mission success be the highest priority in completing JWST development.

The Webb IRB believes that implementing all recommendations contained in this report will contribute to maximizing the probability of mission success. Eliminating the schedule and cost impact of human errors and embedded problems is critical to completing the successful development of JWST. The Webb IRB believes that JWST should continue based on its extraordinary scientific potential and critical role in maintaining U.S. leadership in astronomy and astrophysics. This report contains numerous recommendations all directed toward contributing to the maximization of JWST mission success. The Webb IRB strongly recommends that all the recommendations be implemented.

Webb's world-class science, from detecting light from the first stars and galaxies in the distant universe to probing the atmospheres in nearby exoplanets for possible signs of habitability will underpin many other astrophysics projects that will use its high-caliber capabilities to enhance their science return.

More books from Progressive Management

Cover of the book Command and Control of Military Forces in the Homeland: Lack of Unity of Effort between National Guard and Federal Military Forces in Disasters and WMD Incidents, Posse Comitatus, Hurricane Katrina by Progressive Management
Cover of the book 21st Century FEMA Study Course: Dams Sector Crisis Management Overview Course (IS-870) - Evacuation Planning, Operational Security, Vulnerabilities by Progressive Management
Cover of the book Unconventional Restraint: Obstacles to Army Special Operations Forces' Employment in Support to Resistance Operations - ARSOF STR Irregular Warfare and Case Study of Syria, Assad and ISIS by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: The Soldier's Blue Book - The Guide for Initial Entry Training Soldiers, TRADOC 600-4, Basic Combat Training, Standards of Conduct (Professional Format Series) by Progressive Management
Cover of the book NASA's Nuclear Frontier: The Plum Brook Reactor Facility - Research into Nuclear Propulsion for Rockets and Aircraft by Progressive Management
Cover of the book Learning to Leave: The Preeminence of Disengagement in U.S. Military Strategy - Cold War, Iraq War, New World Order, Effects of Barriers, Revealing Misperceptions That Hinder Ending Wars and Conflicts by Progressive Management
Cover of the book 21st Century Adult Cancer Sourcebook: Chronic Myelogenous Leukemia (CML) - Clinical Data for Patients, Families, and Physicians by Progressive Management
Cover of the book Evaluation of Littoral Combat Ships (LCS) for Open-Ocean Antisubmarine Warfare - History of ASW, Threats, North Korea, China, Russia, Noise Control, Range and Endurance, Data Link, Improvements by Progressive Management
Cover of the book Skylab Mission Report: Second Visit - 1973 Space Station Mission by Bean, Garriott, and Lousma, Mission Activities, Hardware, Anomalies, Science Experiments, Crew Health, EVAs by Progressive Management
Cover of the book Army Correspondence Course: Unit Ministry Team (UMT) Crisis Counseling - The Chaplain Assistant's Role (Subcourse CH1313), plus Army Guide to the Prevention of Suicide and Self-Destructive Behavior by Progressive Management
Cover of the book 2013 President Barack Obama Inaugural Address, the 2009 Obama Inaugural Address, and Campaign Speeches from the Presidential Campaign of 2012 Against Republican Mitt Romney by Progressive Management
Cover of the book Exploring Strategic Thinking: Insights to Assess, Develop, and Retain Army Strategic Thinkers - Qualitative Thinking, Metacognitive Ability, Abductive Reasoning, Visualization, System Theory by Progressive Management
Cover of the book Army Engineers in New England 1775-1975: The Military and Civil Work of the Corps of Engineers in New England, Revolutionary War, George Washington, Dredging, Flood Protection, Boston Harbor by Progressive Management
Cover of the book Russian Arctic Strategy: Or How I Learned to Stop Worrying and Love Bureaucratic Politics - Global Warming Opening Oil, Hydrocarbon, Energy and Transport Rewards, Role of the Siloviki Bloc by Progressive Management
Cover of the book Failed Intervention: The United States in the Balkans - Origins of War, Disintegration, U.S. Strategic Lessons, Legacy of Yugoslavia by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy