Space Shuttle NASA Mission Reports: 2000 Missions, STS-99, STS-101, STS-106, STS-92, STS-97

Nonfiction, Science & Nature, Science, Physics, Astrophysics & Space Science
Cover of the book Space Shuttle NASA Mission Reports: 2000 Missions, STS-99, STS-101, STS-106, STS-92, STS-97 by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781465836540
Publisher: Progressive Management Publication: February 21, 2012
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781465836540
Publisher: Progressive Management
Publication: February 21, 2012
Imprint: Smashwords Edition
Language: English

These official final program mission reports issued by the NASA Johnson Space Center cover missions in 2000: STS-99, STS-101, STS-106, STS-92, STS-97. In these thorough reports, with information and specifics not available on NASA website mission descriptions, each orbiter system is reviewed in detail along with technical information on performance and anomalies.

STS-99: The Space Transportation System (STS) -99 flight was the only planned flight of the Shuttle Radar Topography Mission (SRTM), which acquired high-resolution radar topographic images of the Earth's land mass between 60 °N and 56 °S latitude. The data from this mission will be used to produce a land map that is 30 times more precise than any map in existence prior to the mission.

STS-101: The primary objectives of the STS-101 flight were to provide the ISS Program with logistics capability for transfer and internal/external installation and checkout of ISS hardware, specifically the Orbiting ISS Stage 2A.1, utilizing a double Spacehab module, Integrated Cargo Carrier (ICC) and Orbiter crew compartment. Prior to undocking, one scheduled extravehicular activity (EVA) was performed for external equipment transfer. In addition, the secondary objectives of this flight were to perform the requirements for Space Experiment Module (SEM-06), Mission to America's Remarkable Schools (MARS), Commercial Protein Crystal Growth (CPCG), Protein Crystal Growth-Biotechnology Ambient Generic (PCG-BAG), BioTube Precursor Experiment (BioTube), Astroculture (AST).

STS-106: The primary objectives of the STS-106 flight were to change the Zvezda [Service Module (SM)] from the launch to the flight configuration by installing six ground repressurization inlet caps, removing the fire extinguisher launch restraint bolts and activating the gas masks in the module for the Expedition 1 crew. In addition, the crew performed various logistics activities, which included unloading the Progress cargo vessel into the ISS and transferring equipment, supplies and water from the Space Shuttle to the ISS. The TORU docking unit and the aft docking probe were removed from the Zarya [Functional Cargo Block (FGB)] module. The crew replaced two batteries on the FGB, installed three batteries and associated electronic equipment on the SM, installed voltage converters in the SM and performed other electrical work in the SM. A spacewalk was performed to connect power, data and communication cables between the SM and the FGB, as well as install a magnetometer.

STS-92: The primary objective of the STS-92 flight was to launch, rendezvous and dock with the orbiting ISS stage and deliver to orbit the 3A launch package (LP). The Z1 Integrated Truss Segment (ITS) was attached to the zenith port of Node 1. In addition, the Pressurized Mating Adapter 3 (PMA 3), which was launched on a Spacelab Logistics Pallet (SLP) carrier, was attached to the nadir port of Node 1. Additionally, two extravehicular activity (EVA) tool stowage devices (ETSDs) that were launched on the SLP, and two DC to DC converter units (DDCUs) that were launched on the Get-Away Special (GAS) Beam carriers, were installed on the Z1 truss on-orbit via EVA. Several other EVA tasks, as well as Node 1 ingress, were accomplished during the flight.

STS-97: The primary objective of the STS-97 flight was to deliver and assemble the 4A launch package (LP) to the orbiting ISS Stage 3A.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

These official final program mission reports issued by the NASA Johnson Space Center cover missions in 2000: STS-99, STS-101, STS-106, STS-92, STS-97. In these thorough reports, with information and specifics not available on NASA website mission descriptions, each orbiter system is reviewed in detail along with technical information on performance and anomalies.

STS-99: The Space Transportation System (STS) -99 flight was the only planned flight of the Shuttle Radar Topography Mission (SRTM), which acquired high-resolution radar topographic images of the Earth's land mass between 60 °N and 56 °S latitude. The data from this mission will be used to produce a land map that is 30 times more precise than any map in existence prior to the mission.

STS-101: The primary objectives of the STS-101 flight were to provide the ISS Program with logistics capability for transfer and internal/external installation and checkout of ISS hardware, specifically the Orbiting ISS Stage 2A.1, utilizing a double Spacehab module, Integrated Cargo Carrier (ICC) and Orbiter crew compartment. Prior to undocking, one scheduled extravehicular activity (EVA) was performed for external equipment transfer. In addition, the secondary objectives of this flight were to perform the requirements for Space Experiment Module (SEM-06), Mission to America's Remarkable Schools (MARS), Commercial Protein Crystal Growth (CPCG), Protein Crystal Growth-Biotechnology Ambient Generic (PCG-BAG), BioTube Precursor Experiment (BioTube), Astroculture (AST).

STS-106: The primary objectives of the STS-106 flight were to change the Zvezda [Service Module (SM)] from the launch to the flight configuration by installing six ground repressurization inlet caps, removing the fire extinguisher launch restraint bolts and activating the gas masks in the module for the Expedition 1 crew. In addition, the crew performed various logistics activities, which included unloading the Progress cargo vessel into the ISS and transferring equipment, supplies and water from the Space Shuttle to the ISS. The TORU docking unit and the aft docking probe were removed from the Zarya [Functional Cargo Block (FGB)] module. The crew replaced two batteries on the FGB, installed three batteries and associated electronic equipment on the SM, installed voltage converters in the SM and performed other electrical work in the SM. A spacewalk was performed to connect power, data and communication cables between the SM and the FGB, as well as install a magnetometer.

STS-92: The primary objective of the STS-92 flight was to launch, rendezvous and dock with the orbiting ISS stage and deliver to orbit the 3A launch package (LP). The Z1 Integrated Truss Segment (ITS) was attached to the zenith port of Node 1. In addition, the Pressurized Mating Adapter 3 (PMA 3), which was launched on a Spacelab Logistics Pallet (SLP) carrier, was attached to the nadir port of Node 1. Additionally, two extravehicular activity (EVA) tool stowage devices (ETSDs) that were launched on the SLP, and two DC to DC converter units (DDCUs) that were launched on the Get-Away Special (GAS) Beam carriers, were installed on the Z1 truss on-orbit via EVA. Several other EVA tasks, as well as Node 1 ingress, were accomplished during the flight.

STS-97: The primary objective of the STS-97 flight was to deliver and assemble the 4A launch package (LP) to the orbiting ISS Stage 3A.

More books from Progressive Management

Cover of the book An Evaluation of the Human Domain Concept: Organizing the Knowledge, Influence, and Activity in Population-Centric Warfare – Military Innovation, Development in Sea, Air, Space, and Cyber Domains by Progressive Management
Cover of the book Nixon's Trident: Naval Power in Southeast Asia, 1968-1972 - Walleye TV-Guided Bomb, Naval Bombardment, A-6 Intruder, Air Operations in Laos, Mining Haiphong Harbor, Linebacker, Admiral Moorer, Tet by Progressive Management
Cover of the book Air Force Doctrine Document 3-50: Personnel Recovery Operations - Air Rescue, Combat Search and Rescue (CSAR), Fixed-wing and Vertical-lift Aircraft, Recovery Teams, Isolated Personnel (IP) by Progressive Management
Cover of the book History of the Joint Chiefs of Staff: Volume VIII: The Joint Chiefs of Staff and National Policy 1961-1964 - Strategic Nuclear Forces, Arms Control, Test Ban, Cuban Missile Crisis, Berlin by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: National Guard Counterdrug Support - Authorized Missions, Use of Counterdrug Assets for Non-Counterdrug Missions, Arming of Troops and Use of Force by Progressive Management
Cover of the book U.S. Army Medical Correspondence Course: Introduction to the Veterinary Food Inspection Specialist Career Field - Combat Service Support, Ethics, Standards, Established Practices by Progressive Management
Cover of the book 21st Century FEMA Study Course: National Incident Management System (NIMS) Intrastate Mutual Aid (IS-706) - Emergency Responders, HSPD-5, MABAS, EBAC, Lessons Learned from Hurricane Katrina by Progressive Management
Cover of the book History of the Joint Chiefs of Staff: The First Indochina War 1947-1954 - War in Korea, De Lattre Episode, Erskine Report, Navarre Plan, Dien Bien Phu, Dulles, Vietnam, Cambodia, Laos by Progressive Management
Cover of the book Culture Wars: Air Force Culture and Civil - Military Relations - USAF History on Dealing with National Policy, Case Studies of Operation Desert Storm and Northern/Southern Watch, Decade of Quasi-War by Progressive Management
Cover of the book With the 2d Marine Division in Desert Shield and Desert Storm: U.S. Marines in the Persian Gulf, 1990-1991 - Gulf War, Iraq, Kuwait, Intelligence, Movements and Training, Operations Plan, Offensive by Progressive Management
Cover of the book 2011 After the Nuclear Meltdown: Crucial Survival and Medical Data for Nuclear Power Plant and Radiation Accidents and Terrorism - Essential Emergency Information for You and Your Family by Progressive Management
Cover of the book Velocity: Speed with Direction - The Professional Career of General Jerome F. O'Malley - Controversy about North Vietnam Bombing Authorization and President Nixon, the Lavelle Raids of the Vietnam War by Progressive Management
Cover of the book James Webb Space Telescope Independent Review Board Report May 2018: New 2021 Launch Date and Substantially Higher Costs for Next Great Astronomy Observatory, Findings of Human Errors by Progressive Management
Cover of the book Apollo and America's Moon Landing Program - Moonport: A History of Apollo Launch Facilities and Operations - Saturn 1, Saturn 1B, and Saturn V Rocket Launch Pads, Launch Complex 39 (NASA SP-4204) by Progressive Management
Cover of the book The Chain of Environmental Command: How a Club of Billionaires and Their Foundations Control the Environmental Movement and Obama's EPA: Anti-Fracking, Global Warming and Climate Change by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy